Step TwoPreliminary Design/Feasibility StudyPictures and measurement of existing conditions Preliminary check of existing mechanical and structural systems Municipal assessment - zoning, drainage, and septic issues Conceptual drawings - includes floor plans, perhaps some elevations and computerized images - one concept Preliminary/generic specifications - one concept Preliminary cost estimate - one concept Guaranteed budget to within 10% Move into a Design Agreement Fees for the Feasibility Study - The cost for the Feasibility Study is a minimum of $300 up to 2% of guesstimate. This cost will be applied to the Construction Contract. |
|
|