Step Two

Preliminary Design/Feasibility Study

Pictures and measurement of existing conditions

Preliminary check of existing mechanical and structural systems

Municipal assessment - zoning, drainage, and septic issues

Conceptual drawings - includes floor plans, perhaps some elevations and computerized images - one concept

Preliminary/generic specifications - one concept

Preliminary cost estimate - one concept

Guaranteed budget to within 10%

Move into a Design Agreement

Fees for the Feasibility Study - The cost for the Feasibility Study is a minimum of $300 up to 2% of guesstimate. This cost will be applied to the Construction Contract.